Watch the interview with Al-Gaddafi »→ HERE
Muammar Gaddafi orchestrated the biggest
irrigation project in world history by 
tapping into ‘Primary Water Cycle’ 
all throughout Libya.

The project was designed in five stages and the optimum
target of  the project once its all five stages completed
was to covey a large amount of water estimated to
be 6 million cubic meter in a daily basis from
their sources in the South to the North
where there is an increase urgent
need for clean and safe water
.

~~~~~~~~~~-<◊>-~~~~~~~~~~
SEE FULL STORY →  HERE

Keep in mind the water “control” boards will
NOT tell you about ‘Primary Water’.

In Australia most of them would not have heard of  ‘Primary Water’.  They believe water comes from rain, hail and snow-melt which is the ‘Secondary Water Cycle’.  We are NOT told about ‘The Primary Water Cycle’.
ALL water comes from down below the mantel of the earth’s crust where hydrogen and oxygen merge creating vapour that is forced under pressure to the surface becoming pure fresh water. We are being told water is running out – and we have severe water shortages. – This is NOT true.

~~~~~~~~~~~~~-«<◊>»-~~~~~~~~~~~~~

gaddafi-primary-water

~~~~~~~~~~~~~~<◊>~~~~~~~~~~~~~~

Welcome to Planet Earth! ]